What a side sewer is and who owns it
The side sewer is the private pipe that carries wastewater from your house to the public sewer main, which usually runs under the street or an alley. In Seattle, Seattle Public Utilities is clear that the property owner owns and is responsible for the entire side sewer, from the house to the connection at the main, including the section under the sidewalk and street. Most Eastside cities apply the same rule through their own utility codes; your agent confirms with the city if there is any question about where responsibility ends.
That ownership is why the scope matters to a buyer. A break under the street is the homeowner's repair, not the city's, and the permit and restoration requirements for work in the right-of-way make those repairs the most involved kind.
Original side sewers in this region were often concrete or vitrified clay, and some homes from the 1940s through the 1970s were plumbed with a bituminous fiber pipe commonly called Orangeburg, which softens and deforms with age. Newer replacements are PVC or a cured-in-place liner inside the old pipe.
What the camera commonly finds
Most scopes on older homes find something. The question is severity, and the technician's report will usually grade it. Findings you are likely to see named:
- Root intrusion at joints, where tree roots have entered the pipe and catch debris.
- Offset or separated joints, where sections of clay or concrete pipe have shifted.
- Bellies or low spots, where the pipe has settled and standing water collects.
- Cracks, fractures, or a collapsed section, which can stop the camera from passing.
- Scale and grease buildup that narrows the pipe.
- Deformed Orangeburg pipe, which typically calls for full replacement rather than a spot repair.
- A line the camera could not follow to the main, which is reported as inconclusive and often prompts a second attempt from a different access point.
How a repair request reaches you
The sewer scope is part of the buyer's inspection under Form 35, so anything the buyer wants to do about it arrives the same way as any other inspection issue: on a Form 35R within the inspection period, or under the additional-inspection provision if the general inspector recommended the scope and the buyer gave notice for more time. The 35R may ask you to repair the line before closing, to replace it, to credit the buyer toward the work, or to reduce the price. It usually attaches the scope report and the video link.
You then have the response period written on Form 35 to answer in writing through your agent: agree, propose something different, or decline. Declining gives the buyer their reply period to accept the home as it is or terminate and recover the earnest money. The inspection guide covers the mechanics of that exchange.
Your agent's first step is to read the report closely. A single root intrusion in an otherwise sound clay line and a collapsed section under the sidewalk are both sewer findings, and they warrant very different responses.
What a repair usually involves
Sewer work in this region falls into three categories. A spot repair excavates and replaces a short section where a joint has failed or roots have entered. A full replacement digs a trench along the run and lays new PVC pipe from the house to the main. Trenchless methods, either pipe bursting, which pulls new pipe through the old, or cured-in-place lining, which cures a resin liner inside the existing pipe, avoid most of the digging when the old pipe is intact enough to serve as a path.
In Seattle, side sewer work requires a permit from the Seattle Department of Construction and Inspections and must be performed by a contractor registered with the city as a side sewer contractor. Work in the public right-of-way adds street-use requirements and restoration of the pavement or sidewalk. Eastside cities have their own permit processes through their utility or development services departments. Established sewer contractors handle permits and provide a post-repair video, which the buyer will want.
Timelines run from a day or two for a spot repair in the yard to a week or more when the street, permits, and utility locates are involved. A repair request with closing a few weeks out is therefore a scheduling conversation as much as a cost one.
If you scoped before listing, and if you did not
Sellers who scoped the line before listing and either repaired it or disclosed the findings on Form 17 are in the strongest position now. The buyer's scope confirms what was already known, the report matches the disclosure, and there is little to negotiate. If you did that, have your report, the repair invoice, and the post-repair video ready for your agent to send to the buyer's side.
If the scope is arriving for the first time now, the path is still manageable. Ask your agent to obtain the full video, not just the summary, and to get a second opinion or a repair bid from a licensed sewer contractor before you respond; bids are often free and a contractor's read on severity can differ from the scope technician's. With a bid in hand you can weigh a repair before closing against a credit, and you can respond within the Form 35 period with specific numbers rather than a guess.
Whatever you decide, update your Form 17 disclosure if you now know something material about the sewer that you did not before. Washington law expects the disclosure to reflect what the seller knows, and a documented finding with a clear response is far better than a later dispute.
Your checklist
- 1Locate your sewer cleanout, usually in the basement, crawl space, or yard near the foundation, and make sure it is accessible for the scope.
- 2If you scoped or repaired the line before listing, give your agent the report, invoice, and post-repair video now.
- 3When a 35R with a sewer request arrives, ask your agent for the full video, not only the summary.
- 4Have a licensed sewer contractor review the video and provide a repair bid before you respond.
- 5Respond in writing through your agent within the Form 35 response period: agree, propose an alternative, or decline.
- 6If you agree to repair, confirm permits, a registered contractor, and a post-repair video are part of the scope.
- 7Update your Form 17 sewer disclosure if the scope told you something material you did not know.
What RexMont tracks for you
- Whether a sewer scope is scheduled and whether it falls inside the original inspection period or an additional-inspection window.
- Receipt of the 35R and the scope report and video, filed in your transaction record.
- Your response deadline under Form 35 and the buyer's reply deadline after it.
- If repairs are agreed: permit issuance, contractor scheduling, completion date, invoice, and post-repair video delivered to the buyer.
- Any Form 17 update that results and its delivery to the buyer.
Jennifer Johansen, RexMont’s transaction administrator, coordinates every date and document from mutual acceptance to keys. Questions on price, terms, or strategy go to your RexMont agent.
Sources
This guide explains the process and the standard NWMLS forms in general terms. It is not legal, tax, or lending advice, and your contract controls. Talk to your RexMont agent, escrow officer, lender, or attorney about your specific situation.