RexMont

Buyer guide · Under contract · Washington

Septic (on-site sewage) inspection at the time of sale

If the home you are buying is not on a public sewer, it treats its own wastewater with an on-site sewage system: a septic tank and a drainfield in the yard. King County requires an inspection by a licensed maintainer before the property transfers, and the NWMLS septic addenda give you a window to review the results. This guide covers what the inspection includes, who orders and pays under the contract, the red flags, what happens on a failure, and how to find the county's records for the system.

Early in the contract: the seller's Operation and Maintenance Report (King County) or inspection report is delivered on the schedule written in the septic addendum, and your disapproval window (5 days if the blank is empty) runs from the day you receive it.

Adriano Tori, Designated Broker
Adriano Tori · Designated Broker
WA Lic. #27660 · 5.0 (1,241)

Forms and documents that govern this step

  • Form 22S-King — King County Septic Addendum to Purchase and Sale Agreement
  • Form 22S — Septic Addendum (used outside King County, including Snohomish County)
  • Form 22U — King County Seller's Notice of On-Site Sewage System Operation and Maintenance Requirements (recorded)
  • Form 22V — King County Buyer's Declaration of Receipt of Copy of Notice of OSSM
  • Form 35 — Inspection Addendum, paragraphs 1(a) and 9 (OSS advisory)
  • Form 17 — Seller Disclosure Statement, sewer and septic section
  • Form 90Y — Notice of Termination (septic contingencies)

What an on-site sewage system is, and who regulates it

Outside the sewer service areas, much Eastside and north King County housing runs on an on-site sewage system (OSS): a septic tank, a distribution box or pump chamber, and a drainfield in the yard where soil finishes treating the wastewater. Parts of Woodinville, Sammamish, Issaquah, and most rural King and Snohomish county parcels are on septic. Form 22D paragraph 4 (Utilities) and the seller's Form 17 disclosure state whether the home is connected to a public sewer main or a septic tank.

The Washington State Department of Health sets the statewide rule in WAC 246-272A; local health jurisdictions administer it: Public Health Seattle & King County under the King County Board of Health Code, Title 13, and the Snohomish County Health Department (formerly the Snohomish Health District). Both license or certify the professionals who design, install, inspect and pump systems; in King County the inspector at time of sale must be a licensed on-site system maintainer (OSM).

Form 35 paragraph 9 says OSS systems are subject to strict governmental regulation and occasional malfunction and even failure, and points you to Form 22S. Your general home inspection does not evaluate the system beyond the line from the house to the tank (Form 35 paragraph 1(a)). That is why septic has its own addendum and its own clock.

King County's time-of-sale requirement, and Snohomish County

King County Board of Health Code § 13.60.030 requires that before an OSS-served property transfers, a licensed on-site system maintainer inspect the system and file an Operation and Maintenance Report (O&M Report). Form 22S-King writes it into the contract. Paragraph 3(a): the seller retains the OSM and delivers the O&M Report to you when complete. Paragraph 3(b): the contingency is deemed waived unless you give notice of disapproval within the days written (5 if blank) after receipt; timely disapproval terminates with your earnest money refunded.

Paragraph 3(c) adds the county paperwork: the seller's Form 22U notice of operation and maintenance requirements, recorded before closing; your Form 22V receipt, signed on or before closing; and the county's O&M Program Fee. Paragraph 4, if checked, adds a separate inspection-and-pumping contingency with its own deadlines on the form. The advisory: no pumping before the O&M Report; the system must be observed first.

Snohomish County has no county-specific addendum. Form 22S governs: the seller has the OSS inspected (pumped if needed), delivers the report within the days written (10 if blank) after mutual acceptance, and you have the days written (5 if blank) after receipt to disapprove. Its paragraph 4 requires the seller to comply with local pre-sale inspection ordinances; we confirm the Snohomish County Health Department's requirements when the file opens.

What the inspection covers, and who pays

The maintainer uses the county as-built to locate the tank, distribution box, pump chamber and drainfield, then opens the tank lids. Inside: the liquid level relative to the outlet (above it means the drainfield is not accepting effluent), the depth of scum and sludge, the condition of the inlet and outlet baffles or effluent filter, and signs of cracks, root intrusion or leaks. On a pressure or proprietary system: the pump, floats, control panel and alarm. At the drainfield: soggy ground, surfacing effluent, odors or unusually lush growth, and standing liquid in the monitoring ports. Water is run from the house to watch flow. Pumping follows if the solids call for it.

The result is a written report: components, condition, deficiencies, recommendations, whether the tank was pumped, and in King County the O&M Report filed with Public Health. Read the deficiencies and recommendations line by line.

Who orders and pays is as written in the contract. Under Form 22S-King paragraph 3 the seller retains the OSM for the county report; under Form 22S paragraph 5 and 22S-King paragraph 4 the seller pays for inspection and pumping. A prior inspection within the months written (12 if blank) can satisfy the pumping contingency. Anything beyond that is yours to order and pay for; your lender may add requirements.

Red flags, and what happens if the system fails

Some findings are routine (a tank due for pumping, a cracked riser lid, a filter to clean). Others deserve a conversation with your agent before your window closes:

  • Effluent surfacing or soggy ground over the drainfield, sewage odors outdoors, or a strip of grass far greener than the rest of the yard.
  • Slow drains, gurgling or backups inside the house, or a high-water alarm that has been silenced.
  • Liquid in the tank above the outlet invert, or standing liquid in the drainfield monitoring ports.
  • Missing or deteriorated baffles, a cracked or leaking tank, or roots inside the tank or lines.
  • No as-built on file with the county, components that do not match the as-built, or bedrooms added beyond what the system was designed and permitted for.
  • A drainfield inside the required setbacks to a well, stream or property line, or a reserve drainfield area that has been built over or paved.

Records, the recorded notice, and maintenance after you own it

Public Health Seattle & King County keeps OSS records by parcel: as-built drawings, permits, prior O&M Reports and repair history, searchable online by address or parcel number. Our transaction administrator pulls them at file open. The Snohomish County Health Department maintains equivalent records for its parcels. If no as-built exists, the seller's Form 17 and maintenance records are what you have, and the report should say the system was located by probing.

In King County the Form 22U notice recorded before closing puts the operation and maintenance requirements on title, and they become yours: measure sludge and scum at least every three years for a home without a garbage disposal and annually with one; have performance inspections every three years on a gravity system and annually on pressure distribution, mound, sand filter, aerobic and other proprietary systems, with a maintenance contract where required; pump when the inspection calls for it; keep records.

Day to day: keep vehicles, structures and deep-rooted trees off the tank and drainfield, spread laundry loads, fix leaks, keep grease, wipes and chemicals out of the drains, and know where the reserve area is before you plan a shop, pool or addition. Repairs need a county permit and usually a licensed designer, and range from a filter to a full new drainfield, so learn the system now.

Your checklist

  1. 1Confirm from Form 22D paragraph 4 and the Form 17 that the home is on an OSS, and note which septic addendum is attached: 22S-King, 22S, or a county form.
  2. 2Read the addendum for the seller's report deadline and your disapproval window; note whether the Form 22S-King paragraph 4 pumping contingency is checked.
  3. 3Ask our transaction administrator for the county as-built and prior O&M Reports at file open, and compare the drawing to the property.
  4. 4If the buyer's-right-to-attend box is checked, plan to be there; you will learn where everything is and what the alarm means.
  5. 5Read the O&M Report and inspection report line by line: deficiencies, recommendations, whether pumping was done, and the maintainer's overall finding.
  6. 6Send anything on the red-flag list to your agent the day you receive the report; a specialist opinion or a repair proposal takes time.
  7. 7Decide before your window ends: proceed, propose terms by addendum, or deliver written disapproval.
  8. 8In King County, sign the Form 22V receipt at or before closing and expect the program fee on your settlement statement.

What RexMont tracks for you

  • We identify the septic addendum on the file at open, log the seller's report deadline and confirm the OSM is scheduled; a late report delays your clock but not your closing date, so we chase it early.
  • We compute your disapproval window from the day the report is delivered to you under Form 21 General Terms k and l, and send you the deadline.
  • We pull the county as-built and prior O&M Reports and compare bedroom count and components to the listing, then flag mismatches to your agent.
  • In King County we confirm the Form 22U notice is recorded (with a recording number) before closing, that Form 22V is signed, and that the program fee appears on the settlement statement.
  • We check that no pumping was done before the O&M Report was performed, per the Form 22S-King advisory, and raise it with the listing side if the dates suggest otherwise.

Jennifer Johansen, RexMont’s transaction administrator, coordinates every date and document from mutual acceptance to keys. Questions on price, terms, or strategy go to your RexMont agent.

This guide explains the process and the standard NWMLS forms in general terms. It is not legal, tax, or lending advice, and your contract controls. Talk to your RexMont agent, escrow officer, lender, or attorney about your specific situation.

Questions

Common questions about septic (on-site sewage) inspection at the time of sale

Is a septic inspection required when I buy a home in King County?

Yes. King County Board of Health Code § 13.60.030 requires a licensed on-site system maintainer to perform a monitoring and performance inspection and file an Operation and Maintenance Report before the property transfers. Form 22S-King writes that into the contract, with the seller retaining the maintainer and you receiving the report. Snohomish County requirements differ; Form 22S governs there and our transaction administrator confirms what the health department requires.

Who pays for the septic inspection?

As written in the contract. On Form 22S-King paragraph 3 the seller retains the maintainer for the county-required report, and under Form 22S paragraph 5 and 22S-King paragraph 4 the seller pays for inspection and pumping. A seller may satisfy the pumping contingency with a prior inspection within the months written on the form. Anything you order beyond the addendum is at your expense.

What if the report shows problems?

Your protection on the addendum is a written disapproval within your window, which terminates the contract with your earnest money refunded. The forms do not include a repair negotiation, so if you want the home your agent proposes terms by addendum while the window is open: a repair before closing under a county permit, a credit, or a price change. Without written agreement by the deadline, you terminate on time or proceed.

Why is the general home inspection not enough?

Form 35 paragraph 1(a) limits the general inspection to the line from the house to the tank, and paragraph 9 says OSS is outside Form 35 entirely. A home inspector does not open the tank, measure solids, test the pump and alarm, or evaluate the drainfield. The licensed maintainer does, using the county as-built, and files the result with the county.

How do I find the as-built for the system?

Public Health Seattle & King County publishes on-site sewage records online, searchable by address or parcel number, including as-built drawings, permits and prior O&M Reports. The Snohomish County Health Department keeps the same kind of records for its parcels. Our transaction administrator pulls them when your file opens and sends them to you with the seller's maintenance records.

What maintenance will the county expect from me after closing?

In King County the recorded Form 22U notice sets the schedule: check solids at least every three years (annually with a garbage disposal), have performance inspections every three years on a gravity system and annually on pressure or proprietary systems, pump when needed, keep a maintenance contract where the system requires one, and keep records. Protect the drainfield from vehicles, structures and trees.

Adriano Tori, Designated Broker — RexMont Real Estate

Page author

Adriano Tori

Designated Broker, Founder & CEO — RexMont Real Estate · WA Lic. #27660

Reviewed by Adriano Tori, Designated Broker · last reviewed September 9, 2026

5.0 · 1,241 Google reviewsBest of 2026NWMLS MemberAbout Adriano →

Other audiences: Seller guides